Two sentences that decide what we bid, how we staff a route, and what we refuse to compromise when a schedule tightens.

Our mission is to build outside plant that is installed correctly the first time and documented well enough to maintain for decades. Our vision is to be the directional drilling and fiber construction contractor Florida network owners call when a build has to hold schedule, survive inspection, and stand up to storm season.

Our Mission

Build outside plant that is installed correctly the first time and documented well enough to maintain for decades.

That sentence has two halves and they carry equal weight. Installed correctly covers depth, separation, alignment, pull tension, bend radius, splice quality, and restoration. Documented well enough covers the record that lets someone locate, repair, or extend the plant long after our crew has left the site.

A network owner does not buy a bore. They buy an asset they have to operate, locate, and repair for its service life. Our mission is written from that side of the transaction.

What the Mission Means on a Job Site

Mission statements are only useful if a foreman can act on them at the start of a shift with a locate ticket in hand. Ours converts into a short set of field rules.

  • Verify locates in the field before the rig moves, and pothole where marks conflict with the design
  • Stop production rather than guess when ground conditions or an unmarked utility contradict the plan
  • Record depth and alignment as the bore progresses, not after the pullback
  • Photograph structures, crossings, and restoration before backfill closes the evidence
  • Leave private property in the condition the owner expects, including sod, irrigation, and driveway surfaces
  • Report production daily so the schedule conversation is based on facts, not optimism

What Does Installed Correctly Mean in Practice?

Installed correctly means every measurable requirement in the design, the permit, and the material specification was met and can be shown. It is not a feeling at the end of the day. It is a set of checks with a record behind each one.

Depth of cover has to meet the permit and the design. Separation from existing utilities has to meet the owner's and the permitting agency's requirements. Cable has to be placed within the manufacturer's limits for pulling tension and bend radius. Splices have to test within the project's loss budget, usually confirmed with an optical time domain reflectometer, or OTDR. Restoration has to return the site to the condition it was in before work started.

If any one of those cannot be shown in the record, the work is not finished to our standard, even if the circuit lights up.

What Does Documented for Decades Mean?

Documented for decades means the record still works after everyone who built the plant has moved on. Staff change at the owner, at the engineering firm, and at the contractor. The plant stays in the ground, and the next person to dig near it depends entirely on what was written down.

That sets a practical bar. Records are tied to physical locations a stranger can find, such as stationing, GPS coordinates, or measured offsets from fixed features. They are delivered in the format the owner's mapping or GIS team actually uses. Where the design calls for tracer wire, it is installed and tested so the plant can be located electronically. A record that only makes sense to the crew that wrote it does not meet the mission.

Our Vision

To be the directional drilling and fiber construction contractor Florida network owners call when a build has to hold schedule, survive inspection, and stand up to storm season.

That is a narrower ambition than being everything to everyone. We are not trying to be a general contractor. We are trying to be the specialty contractor whose scope never becomes the reason a program slips.

Storm season is in the vision on purpose. In Florida, plant quality is tested by weather every year, and so is a contractor's ability to mobilize for restoration when it matters. A build that looks fine in June and fails in September was not built to our standard.

How We Grow Toward It

Growth follows capability, not the other way around. We take on a larger footprint when the crews, the equipment, and the supervision exist to run it at the same standard we run Volusia County today.

Volusia County is the core. Central Florida, covering Orange, Seminole, Osceola, Lake, and Polk counties, is the working secondary area. Statewide Florida work is available for projects that justify staging and travel, and we are extending toward North Carolina as regional demand develops.

Expansion is also constrained by permitting familiarity. Every county and municipality has its own review cycle, its own maintenance of traffic expectations, and its own inspection habits. A contractor who does not know them will quote a schedule they cannot hold, so we learn a jurisdiction before we promise dates in it.

Why the Mission Is Written for the Owner

Most contractor mission statements describe the contractor: their commitment, their people, their standards. Ours describes the condition of the asset after we leave, because that is the part a network owner can actually inspect and the part they have to live with.

It is also the harder standard. A crew can finish a bore, feel good about the day, and still leave a record that is useless in five years. Writing the mission around the maintained asset forces the record to be finished before the job is.

How We Hold Ourselves to It

We measure the things that a project manager feels, rather than the things that look good in a brochure. None of these require a customer to take our word for it, because each one shows up in their own records.

  • Did the crew hit the mobilization date we committed to
  • Did daily production match what was reported
  • How many utility strikes and near misses occurred, and what changed afterward
  • How many closeout packages were returned for correction
  • How many restoration callbacks came from property owners
  • How quickly we mobilized on an emergency restoration call

What We Will Not Do

A mission is also a list of refusals. We will not bid a schedule we do not have the equipment and crew to hold, because a cheap date that slips costs a program more than an honest one.

We will not bore blind past a conflicting locate, we will not sign a closeout package that does not match what is in the ground, and we will not leave a property in a condition we would argue about with the owner. Those are not negotiable when a schedule tightens, and a schedule always tightens.

Key takeaways

  • Strilla's mission is to build outside plant installed correctly the first time and documented well enough to maintain for decades.
  • Installation quality and record quality are treated as one deliverable, so work without a usable record is unfinished work.
  • The vision is to be the specialty contractor whose scope never becomes the reason a program slips.
  • Storm season is written into the vision because Florida weather tests plant quality and restoration readiness every year.

Key terms

Depth of cover
Depth of cover is the vertical distance from the finished ground surface to the top of buried conduit or cable. Minimum cover is set by the design, the permitting agency, and the facility owner, and it is verified during drilling and recorded in the bore log.
OTDR testing
OTDR testing uses an optical time domain reflectometer to send light pulses down a fiber and measure reflections. The resulting trace shows splice loss, connector loss, and the distance to faults or breaks, and it is a standard acceptance record for fiber construction.
Tracer wire
Tracer wire is an insulated conductor placed with nonmetallic conduit so the route can be found later with electronic locating equipment. Without it, plastic conduit is difficult to locate, which raises the risk of strikes when others excavate nearby.
Atlantic hurricane season
The Atlantic hurricane season officially runs from June 1 to November 30 each year. For Florida network owners it defines the period of highest risk for aerial damage, flooding, and outages, and it shapes when restoration crews must be ready to mobilize.
What installed correctly means, and how it is shown in the record
RequirementWhat correct meansEvidence in the closeout
Depth of coverMeets the permit and design minimumBore log readings along the path
Utility separationMeets owner and agency requirementsLocate records and pothole photos
Pull tension and bend radiusWithin the cable manufacturer's limitsPlacement records for each pull
Splice qualityWithin the project loss budgetOTDR traces and loss test results
LocatabilityTracer wire continuous where specifiedTracer continuity test record
RestorationSite returned to its prior conditionBefore and after photo log
What a closeout package contains

What this means for your project

A mission written around the maintained asset changes what you can expect at closeout. You should receive records that let your own staff, or a contractor you hire years from now, find and repair the plant without guessing. That lowers future locate costs and strike exposure on every segment we build.

On schedule, the refusals matter more than the promises. A contractor who will not bid a date it cannot staff gives you a schedule you can report upward with confidence. One that bores past a conflicting locate to save a day can cost you weeks in outage response, damage claims, and permit scrutiny.

Frequently Asked Questions

What is Strilla Communications Company's mission?
Our mission is to build outside plant that is installed correctly the first time and documented well enough to maintain for decades. Installation quality and record quality are treated as one deliverable, not two. A bore that meets depth but has no usable as-built does not meet the mission, and neither does a perfect record of work that was installed wrong.
How does the mission affect what a customer receives?
The mission sets what goes into the closeout package and what happens when field conditions contradict the design. Work stops and gets resolved rather than proceeding on a guess, and the record reflects what was actually installed. In practice the customer receives as-builts, photos, and test results that match the ground, delivered as part of the job rather than as an extra.
What is the company's vision?
Our vision is to be the directional drilling and fiber construction contractor Florida network owners call when a build has to hold schedule, survive inspection, and stand up to storm season. It is deliberately narrow. We aim to be the specialty contractor whose scope is never the reason a program slips, rather than a general contractor that does everything.
Why is storm season part of the vision?
Storm season is part of the vision because Florida tests outside plant with weather every year. The Atlantic hurricane season runs from June 1 to November 30, and plant that is shallow, poorly attached, or badly documented fails first and takes longest to repair. Building to survive that season, and being ready to restore after it, is part of building correctly in Florida.
How do you measure whether you are meeting the mission?
We measure outcomes the customer can check in their own records. Did mobilization happen on the committed date? Did reported production match the field? How many closeout packages came back for correction, and how many restoration callbacks came from property owners? Strikes and near misses are tracked along with what changed afterward, so the measures reflect field reality rather than marketing.
What will the company refuse to do, even under schedule pressure?
We will not bid a schedule we cannot staff, bore past a conflicting locate, sign a closeout that does not match the ground, or leave a property in a condition the owner would dispute. These refusals hold when the schedule tightens, which is exactly when they matter. An honest date and a stopped bore cost less than a slipped program or a strike.
Does the company plan to expand outside Florida?
We are extending toward North Carolina as regional broadband work develops. Expansion follows crew and equipment capability so the standard does not drop in the process. Before promising dates in a new jurisdiction, we learn its permit review cycles, traffic control expectations, and inspection habits, because a schedule built without that knowledge is one a contractor cannot hold.

Request a Bid

Ready to start your next directional drilling or fiber project?

Send the scope and we will come back with a clear, documented bid. Owned crews, aerial and underground under one contract, and a closeout package that lets you close the file.

Most bid requests receive a response within one business day.