Checklist

Bid Request Checklist

Use this before you send a scope out to bid. Gaps here are the single most common reason bids come back with wide contingency or change orders later.

A bid request checklist lists the information a directional drilling or fiber construction contractor needs to price work accurately: route and footage, surface types, crossings, soil expectations, restoration standard, permitting responsibility, schedule, and the documentation level required at closeout.

Route and scope

  • Route definedStart point, end point and general alignment, ideally with a map or KMZ.
  • Approximate footageTotal run length, split by aerial and underground if the route changes character.
  • Conduit or cable specificationSize, count, type and whether the contractor supplies material or you do.
  • Crossing inventoryNumber and type of road, driveway, railroad and waterway crossings.
  • Surface types along the routeAsphalt, concrete, brick, sod, landscaping and any decorative or historic surface.
  • Aerial scope if anyPole count, attachment height, whether make-ready is complete and who owns the poles.

Site conditions

  • Known existing utilitiesAny as-builts, prior locates or known congestion in the corridor.
  • Soil informationGeotechnical data if available, or known conditions such as rock, muck or high water table.
  • Access and stagingWhere equipment can stage, where spoil goes and any access restrictions.
  • Environmental constraintsWetlands, protected trees, conservation areas or waterbody proximity.

Commercial and compliance

  • Permitting responsibilityWho pulls which permits, and whether permits are already in hand.
  • Traffic control expectationsWhether MOT plans exist, and any restricted work windows.
  • Restoration standardThe standard restoration must meet, and who inspects and accepts it.
  • Insurance and bonding requirementsCoverage limits, additional insured requirements and any bonding.
  • ScheduleDesired start, required completion, and whether either is contractual.
  • Documentation required at closeoutAs-built format, test records, photo requirements and any client-specific template.

Use your browser print function to save this checklist as a PDF. The print stylesheet strips the navigation and expands everything, so it prints clean. Nothing here is gated and we do not ask for your email to use it.

Request a Bid

Ready to start your next directional drilling or fiber project?

Send the scope and we will come back with a clear, documented bid. Owned crews, aerial and underground under one contract, and a closeout package that lets you close the file.

Most bid requests receive a response within one business day.