When Aerial Fiber Makes More Sense Than Underground
Comparing aerial versus underground fiber: cost drivers, schedule risk, wetlands and rock, storm exposure, hybrid routes and how to decide segment by segment.
January 27, 202613 min read
Blog Category
Strand, lash, make-ready and the pole line side of outside plant.
Comparing aerial versus underground fiber: cost drivers, schedule risk, wetlands and rock, storm exposure, hybrid routes and how to decide segment by segment.
January 27, 202613 min read
The real sequence of an aerial fiber build: permits, survey, make-ready, strand placement, lashing, slack, splicing and OTDR testing, restoration and closeout.
December 2, 202513 min read
What make-ready covers on an aerial fiber build: pole surveys, loading analysis, simple versus complex work, attacher transfers and how to sequence around it.
October 28, 202513 min read
How strand and lash aerial fiber work is actually built: messenger strand tension and sag, the lashing pass, slack storage, overlash rules and pole loading.
September 23, 202513 min read
These articles explain how fiber is built on utility poles. Aerial fiber hangs from a steel messenger strand attached to each pole, and the cable is lashed to the strand with a thin wire wrapped in a spiral. Before any of that, make-ready prepares the poles so a new attachment fits within the required clearances.
Each article covers one part of the aerial build: what strand and lash really involves, how make-ready supports it, the full sequence of steps, and when aerial makes more sense than underground.
On most aerial routes, the slowest step is not the construction. It is make-ready, the work of moving existing attachments or replacing poles so the new cable fits. That work is done by the pole owner and existing attachers on their schedule, not by the fiber contractor.
Clearances come from the National Electrical Safety Code, or NESC, and the pole owner's own standards. A contractor surveys and documents each pole, coordinates make-ready, and then builds. Understanding that sequence explains why aerial projects can be fast to build but slow to start.
Request a Bid
Send the scope and we will come back with a clear, documented bid. Owned crews, aerial and underground under one contract, and a closeout package that lets you close the file.
Most bid requests receive a response within one business day.